It is recommended to assort the engine at the special stand if the stand is not present, fix the engine on an equal platform.
If the restored engine is got, it is necessary to remove all hinged units, and to establish them subsequently precisely in the same order as well as at samotoyatelny major maintenance. Such units treat: – generator and arms; – details of system of decrease in toxicity; – distributor of ignition, candle and high-voltage wires; – thermostat and cover; – the pump of cooling liquid; – details of system of injection of fuel or carburetor; – collectors; – oil filter and sensor of pressure of oil; – engine mount arms; – flywheel / leader hydrotransformer disk; – back intensifying plate.
Before removal of hinged units put labels on laying, epiploons and other details to facilitate assembly.
If the block of cylinders of an incomplete complete set is established, it is necessary to remove also a head of the block of cylinders, the oil pallet and the oil pump.
If it is planned to carry out major maintenance with complete dismantling, the engine should be disassembled completely in the following order: – cover of a head of cylinders; – soaking-up and final collectors; – forward covers; – chains and asterisks; – the pump of cooling liquid; – head of cylinders; – oil pump; – shatunno-piston group; – the crankshaft with radical bearings; – cam-shaft; – rollers and yokes (except М40); – hydropushers and levers of pushers (М40); – crackers of springs of valves and spring; – valves. |